Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/efficacity.wiboo.digital/httpdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the unlimited-elements-for-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/efficacity.wiboo.digital/httpdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/efficacity.wiboo.digital/httpdocs/wp-includes/functions.php on line 6121
Réalisation Archive - Efficacity

Nos réalisations

Accueil > Nos Réalisations

Appui technique pour la mise en place d’une stratégie d’évaluation du programme CITIIS

Client :Agence Française de Développement (AFD)
Date :2019-2020

Évaluation des politiques publiques appliquées à la ville durable

Client :Caisse des Dépôts (CDC)
Date :2017 - 2020

ACER : Accelerating Condominium Energy Retrofitting

Client :Interreg – Commission Européenne
Date :2018-2020

Mise en place du dispositif de déploiement, de suivi et d’évaluation des Contrats de Transition Écologique (CTE)

Client :Ministère de la transition écologique et solidaire (MTES)
Date :2019-2020

Détection de sites pilotes en Seine Saint Denis pour la récupération de chaleur fatale sur le réseau d’assainissement

Client :Conseil Départementale de Seine Saint Denis (CD93) – Direction Eau et Assainissement (DEA)
Date :2019

Rôle d’ENEDIS dans la labellisation ÉcoQuartier

Client :ENEDIS
Date :2018-2019

Accompagnement du Territoire de la Côte Ouest, à la Réunion, dans le montage d’un Contrat de Transition Ecologique

Client :Territoire de la Côte Ouest (TCO), La Réunion
Date :2018 - 2019

Vers la mise en œuvre d’un Démonstrateur Smart Grid multi-énergies sur le Parc ICADE Les Portes de Paris

Client :ICADE
Date :2018-2019

Contextualisation des études énergétiques du pôle d’échanges multimodal de Toulouse-Matabiau

Client :Europolia
Date :2018
This site is registered on wpml.org as a development site.